TABLE OF CONTENTS
7. ENVIRONMENTAL
COMPLAINT AND NON-COMPLIANCE
8. IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURES
FIGURES
Figure
1 Project General Layout
Figure
2 Air and Noise Monitoring
Locations
LIST
OF APPENDICES
Weather and Meteorological Conditions during
Reporting Month |
|
|
|
i.
The
Civil Engineering and Development Department HKSAR has appointed MateriaLab
Consultants Limited (MCL) to undertake the Environmental Team services for the
Project and implement the EM&A works.
ii.
This
Monthly EM&A report presents the environmental monitoring and audit works
for the period between 1 December and 31 December 2019. As informed by the
Contractor, major activities in the reporting month were:
Excavation and laying of drainage
pipe and manhole;
Construction of SUS structure;
Construction of District
Cooling System;
Construction of road base and
road pavement;
Utility laying;
Removal of temporary decking
and temporary road pavement.
Breaches of the Action and Limit Levels
iii.
No Action / Limit
Level exceedance was recorded for 24-hr TSP and construction noise at KTD1a,
KTD2b and KER1b in the reporting month.
Complaint,
Notification of Summons and Successful Prosecution
iv.
No environmental
complaint, notification of summons and successful prosecution were received in
the reporting month.
Reporting Changes
v.
There was no
reporting change in the reporting month.
Future Key Issues
vi. The key issues to be considered in the
coming reporting month include:
Potential environmental impacts arising from the above construction activities are mainly associated with construction dust, construction noise, water quality, waste management and landscape and visual impacts.